IP DECT INSTALLATION COMPLETE

March 2020

Bambridge Lee Ltd have recently complete the installation of a new Ascom IP DECT telephone system at a care home in Wisbech, Cambridgeshire.  These works were for our long time client Clarion Housing for whom we assist with our 24/7 electrical contractor helpline and response for the maintenance of their warden call, door entry, access control, telephony, fire systems and security systems throughout East Anglia.

These works required us to survey, design and install an IP DECT telephone system capable of integrating with the current Tynetec warden call system on site to assist the scheme managers with calls to ensure the safety of the both the residents and carers.  This included a full wire of a new system and installation of signal repeaters throughout to ensure that excellent coverage is achieved.  Our experienced engineers then completed the programming of the system, working alongside the client and provided assistance to guarantee it was setup to exactly how they wish to utilise the system.

The system is now up and running and the client are delighted with the end product and the improvements it has made to their system and working practices.  We look forward to continue to assist Clarion Housing with their electrical needs.

Address:

Unit 8,

Bramley Road,

St Ives, Cambs,

PE27 3WS

©2017 by Bambridge Lee Ltd. Proudly created with Wix.com